NEW PALMANOVA INTERCHANGE AND S.S. 352 VARIANT

Contract/Supply

New Palmanova interchange and Variant of S.S. 352 di Grado – Lot 2 from S.S. 352 to S.S. 14.

Contracting authority

Autovie Venete S.p.A.

Location and year of completion

Palmanova (UD) – 2015

Description

Supply of 2 treatment systems for stormwater runoff from the road surface. Nominal flow rate 240 and 400 l/s. The systems are designed and manufactured according to EN 858 with lamellar separator filters.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.